layoff rope
Discussion in Striping & Marking started by laneliner (unclaimed legacy handle), Mar 20, 2005. 4 replies, last reply Mar 20, 2005.
You chalk and snap in one move. You obviously need a way to anchor at your beging point......a helper or a weight like I use. From the anchor point you walk away chalking the clothesline and then snap it. I have used the clothesline and semisphere chalk for 30 years. Seems easier than one of those newfangled striping chalk boxes. Those chalk box lines aren't cheap to replace compared to 1/4" cotton clothesline. I prefer 1/8" when I can get it. You might get 180 feet in one of those fancy boxes but do you ever use it all? 180 feet is one long snap.
This method as described by BSinBend was the method of choice (and still is for many that have been striping longer) before they came out with the "giant" chalk lines. Old string lines were thin like a carpenter's line so they would only hold enough chalk to do a couple of spaces and max. length was about 75'. I can't recall (too many years ago) but I heard a couple of fellows who both used this method discussing types of cord at one of the Expos. I can't remember what 1 was telling the other he had found that held chalk much better and let him get a lot more "pops" per chalking, but it was obvious the type cord used makes a lot of difference.
This archived thread is closed to replies.
Members can pick it up in the member forum: a new thread that quotes this one and links back here.
Continue this discussion
Continuing the archived discussion layoff rope. Your thread opens in the member forum and links back to it.
PLSIC members start threads here. It is free for striping contractors and property owners; the panel beside this page has the two ways to join.
From the Parking Lot Planet archive, 2005 to 2016. About this archive Report a post