O & M for pavement markings

Archived, read-only

Discussion in Striping & Marking started by ericram30 (unclaimed legacy handle), Jun 1, 2013. 8 replies, last reply Jun 9, 2013.

ericram30Unclaimed legacy handleStarted the thread
ericram30Unclaimed legacy handle, started the thread

Is there a standard Operations and Maintenance sheet that someone can send me for pavement markings on new construction?

ericram30, Report#1
LaredoStripingUnclaimed legacy handle
LaredoStripingUnclaimed legacy handle

never heard of such a thing, but if you do get one, please forward me a copy

LaredoStriping, Report#2
straightlineUnclaimed legacy handle
straightlineUnclaimed legacy handle

No such thing. Every city, state and little town has its own standerd in its building code. Check with the code enforcement office in the place this new construction is in.

straightline, Report#3
MiltUnclaimed legacy handle
MiltUnclaimed legacy handle

Follow the blue prints and the liability for code compliance will fall on the engineering firm and or general contractor. 1. Always ask if these are the latest plans and keep a copy even if you have you have to pay for printing. 2. Always apply common sense. 3. Always start layout on non movable objects like ADA ramps then if there is an error in the drawings the rest can be adjusted with a change order. 4. ALWAYS ALWAYS ALWAYS get change orders in writing and signed.

Milt, Report#4
LaredoStripingUnclaimed legacy handle
LaredoStripingUnclaimed legacy handle

ditto on starting layout on ramps or non movables

LaredoStriping, Report#5
TruColorsUnclaimed legacy handle
TruColorsUnclaimed legacy handle
Milt wrote on Jun 2, 2013:Go to #4

3. Always start layout on non movable objects like ADA ramps then if there is an error in the drawings the rest can be adjusted with a change order.

That is good advice. I haven't encountered an issue yet but I will start doing this from now on. It makes complete sense.

TruColors, Report#6
straightlineUnclaimed legacy handle
straightlineUnclaimed legacy handle
TruColors wrote on Jun 8, 2013:Go to #6
Milt wrote on Jun 2, 2013:Go to #4

3. Always start layout on non movable objects like ADA ramps then if there is an error in the drawings the rest can be adjusted with a change order.

That is good advice. I haven't encountered an issue yet but I will start doing this from now on. It makes complete sense.

You will find that concrete and asphalt people can not read a tap measure, nothing is where it should be. Nothing worst then spending an hour measuring the thing only to find that a line ends up in the middle of a ramp. Measure for the ramps first then you can fit every thing else in, the fat chic can park in the big space on the end. I did one they measured so bad that a support column was right in the middle of the handicapped ramp.

straightline, Report#7
Calif StriperUnclaimed legacy handle
Calif StriperUnclaimed legacy handle

Always do a full layout before any paint goes down. Once did a brand new parking lot off of plans by a well respected engineering firm and as I got to the last row of spaces I ran out of parking lot to layout. 23 feet short of what was on the plan. I don't know if it was the engineering company or the contractor. Fortunately no paint on the ground and the owner and I were able to make changes on the fly and get it done for an event the next day.

Calif Striper, Report#8
MiltUnclaimed legacy handle
MiltUnclaimed legacy handle

Yes you couldn,t be more right on. We once came up five spaces short on a new school. Like you don't know who made the. Error but you can't paint what is not there.

Milt, Report#9

This archived thread is closed to replies.